August 25 to September 10 Getting Ready to Cruise

Well the Labor Day weekend was spent in the Berkshires, welcoming Liannes new puppy, Finn,  who I call "two pounds of cute fluff"












and visiting her new grandson, Jude.
Ilene climbed with me to the top of Monument Mountain, just north of Great Barrington so we know that her recovery from the removal of the tumor from her lung is making great progress. And I spent at least a day trying to get her medical insurance restored after a foul up of monumental proportions. But this is a sailing blog so lets get to it.

Well actually I did more working on the boat than sailing during this period: 24 hours of work spread over five days, two of them with helpers: Peter, who sailed with me from Virginia to Tortola in November 2010, at the outset of this blog, and our nephew Mendy, who washed the black streaks from the freeboard with salt water while

standing in the dink, and got a sunburn  (and my gratitude and a steak dinner) for his efforts. This working time compared to only 11 hours underway on four days. Such a sailing ratio, once per four days, is below average, but an unfortunate necessity when preparing to go cruising

We got the dink fully inflated after obtaining its parts and accessories from several places, and got it hoisted and secured to its davit bar after Mendys work. I did a lot more sanding and varnishing of the teak cockpit table, the 13 new brass switch plates and the 21 old brass trim rings for the overhead lights after the green corrosion was sanded off. The single biggest task involved the handles used to protect against accidental turning on of the cabin sole lights by brushing against that switch at the companionway, for which new holes had to be drilled.
Another major project was the installation of a "T" valve to be able to divert fresh water from the water maker to the starboard water tank. Peter helped me on this which required removal of the cabin sole to run the pencil thin low pressure black hose from port to starboard, tie it to larger hoses with wire wraps, figure out how the valve worked and attach it to a much bigger and more solid hose so it wont bounce around, and removal of  the aluminum viewing port from the top of the starboard water tank, drilling holes in it, and using blue liquid gasket material to seal the fitting to it and it back onto the tank. Peter also winched me to the top of the mast to inspect and adjust the genoa halyard and this time I got in a photo op of the Club from about 62 feet above sea level, but at low tide.
I also refilled the propane tank and re-installed it in its newly waterproofed locker and took the life raft off the boat to Westmarine to be sent to the repacking company which should be done every three years -- but we have "used" it for four. And while in such a mindset I checked out the inflatable life vests. Ive learned his should be done annually but had never done this before! A decade! The CO2 cartridges are corroded beyond repair and one needs to be replaced. But even worse, the other vest, when inflated by blowing through the tube, failed to hold air -- it was down to 1/3 of its air after an hour. So a new one has been ordered plus a two million candlepower flashlight for finding ones mooring at night.

Getting the dink hung aft and the propane filled really reminded me that cruising is right around the corner.















Oh yeah, some sailing days were fun too.
First with Lene, Cynthia, who sailed with us earlier this summer and has moved to Israel, and Rhonda,
a friend of Lenes since third grade, shown here at dinner at the Black Whale after sailing. The three ladies chatted the entire time, moving gracefully out of my way from time to time as needed for my sail handling. In modest winds we hit a tide assisted 8.1 knots under main and small jib enroute to the far side of Manhasset Bay.
Next, Lene came with me and Peter, who later spent a day working with me and Debbie,
our Rabbi, during which we got to Matinecock and back, with Peter at the helm most of the way.










The excitement on this trip was a "hat overboard" drill during which we successfully retrieved Peters expensive Tilley hat. This picture was taken before it went swimming.
The ever lovely Lene on the leeward
side, with Debbie and Peter

I also sailed for a couple of hours aboard Bennetts Beneteau, to Great Neck on the east side of Stepping Stones, and back, in about four knots of wind. Upon returning I joined Morty and Clara, Mike and Sandy and Richie and his friend Charley, a survivor of the attack on Pearl Harbor, for refreshments aboard "Easy Living." The Wednesday afternoon ritual.
Finally, on one of the work days, after completion of the chores, Rhoda came out and we had the best sailing, due to stronger winds from just a bit east of south. After close reaching it out of Eastchester Bay on port tack, we got on starboard and made it to green can "1", NE of Stepping Stones before returning via Hart Island Sound.

Related Posts by Categories

0 comments:

Post a Comment




Blog Archive

Powered by Blogger.